Multnomah County Online Voters' Guide November 2008 General ElectionMeasure No. 26-102
BALLOT TITLE
EXPLANATORY STATEMENT The District's Barlow Tank elevated reservoir was built in the 1930's. Video inspection reports were provided to Compass Engineering and Lee Engineering to conduct a comprehensive study regarding the condition of the reservoir and the useful life of it. The study determined that the 1930's reservoir should be replaced before any failures occur. The structure does not meet current earthquake standards and poses safety issues. A comparison of costs by the District indicate that the replacing the existing elevated reservoir rather than repairing it would save the District money over time. Passage of the bond measure would provide funds to demolish and remove the existing elevated Barlow water tank and construct and equip a new elevated water tank and pay fees associated with issuing the bonds. The bonds would mature in twenty (20) years or less from the date if issuance and may be issued in one or more series. The estimated average annual cost of this bond would be $0.67 per $1000 of assessed value. The owner of a home assessed at $200,000 is estimated to pay $134.00 a year.
No argument FOR or AGAINST this measure were filed.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||